Case Studies Mining & Metals

 

Goro Nickel Mine Water Treatment Plant, New Caledonia

goro nickel water treatment

Capacity 14.4 ML/day

VWS has implemented 2 contracts for Goro Nickel. The first contract is a packaged demineralised water treatment plant comprising 3 fully assembled trains, with all components to be pre-assembled in the factory.

The second contract is for a Continuous Microfiltration Plant, designed to provide a continuous net capacity of 600m3/hr of filtered water. It has been designed for removal of suspended solids from raw water.

The treated water will produce high quality industrial process water for the oil fired steam and power plant, taking raw water from the Yate Dam.

Technologies:

  • Continuous Microfiltration
  • Package Demineralised Plant - Cation exchanger, Anion exchanger, mixed bed polisher